Roads

Screen Shot 2016-07-01 at 3.27.02 PM

I-4 Ultimate Project

The I-4 Ultimate makeover is a public private partnership (P3) project with a contract term of 40 years. It involves the reconstruction of 15 major interchanges; reconstruction of over 140 bridges; four variable priced toll Express Lanes in the median;

roads

Capacity Expansion Widening

Capacity Expansion Widening of the Sawgrass Expressway (SR 869) from South of Sunrise Boulevard to South of US-441/SR 7 Florida Department of Transportation – Florida Turnpike Enterprise Project Description The Florida Department of Transportation conducted an 18.5 mile PD&E Study

SR 52 limits rev1.

SR 52 7 Mile Realignment

FDOT Case Study for Data Fusion in Design Surveys Presented at the FDOT Design Expo in Jacksonville FL, May 2016 Delivering a complete topographic design file using data fusion of Aerial LiDAR, Mobile LiDAR, and Traditional Survey. Topics include integrating

Contact ACA